Construction in Islamabad, grey structure or turnkey, from approved drawings to handover

Call +92 336 8000925 or visit our B-17 office. We build in Islamabad, grey structure or turnkey, with one team from approved drawings to handover.

3D design of a house in Islamabad by AK Architects, grey structure or turnkey construction3D design
3D design from AK Architects, Islamabad.

We build houses in Islamabad. We work grey structure or turnkey. We do the material procurement and the site labour ourselves. We do not hand a project over after design only. Our office is at Office No 119, Ijaz Ahmed Avenue, Block B-1 Multi Gardens B-17, Islamabad 44000. We are open Monday to Saturday 9am to 6pm, and closed on Sunday.

What grey structure includes

Grey structure is the shell of the house. It is the structure, the walls, the roof and the basic services that make the building stand and stay dry. You choose it when you want control of the finishing, or when you want to finish in stages.

Grey structure includes the excavation and foundations, the structure and frame, the brickwork and blockwork, the roof and the basic plaster. It includes the material procurement for those items and the site labour to build them. It includes the site management for the structure stage, and the site visits that go with it. It does not include the finishing, the fixtures, the fittings or the final services. It does not include the utility meters, the security deposits or the post handover maintenance. Those are listed below, so the boundary is clear before you ask for a figure.

Residential, and the plot sizes it covers5 marla, 10 marla and 1 kanal house designs

What turnkey includes

Turnkey is the finished house. It is grey structure plus the finishing, the fixtures and the fittings, ready to move into. You choose it when you want one team to take the build from the approved drawings to handover, and one written BOQ to price it.

3D design of turnkey house construction in Islamabad by AK Architects3D design

Turnkey includes everything in grey structure, plus the flooring and tiling, the kitchen and bathrooms, the doors and windows, the paint and the fixed fittings. It includes the electrical and plumbing work, the sanitary work and the final finishes. It includes the material procurement for those items and the site labour to install them. It includes the site management for the whole build, and the handover at the end. It does not include the utility meters, the security deposits or the post handover maintenance. Those are listed below.

Interior, and the finishing it covers

What is not included

These items are not in the grey structure or the turnkey scope, and they are not in the per square foot figure that other firms quote. They are separate, and you should budget for them apart from the build.

  • Utility meters (WAPDA, SNGPL)
  • Security deposits
  • Post handover maintenance

Grey structure or turnkey

The choice is about control and about how much finishing you want us to do. Use the table to compare the two scopes side by side, then talk to us about your plot and your drawings.

ItemGrey structureTurnkey
Structure, walls and roofIncludedIncluded
Material procurementIncludedIncluded
Site labourIncludedIncluded
Flooring, tiling, kitchen and bathroomsNot includedIncluded
Doors, windows and paintNot includedIncluded
Electrical, plumbing and sanitary workBasic onlyIncluded
Fixed fittingsNot includedIncluded
Site managementFor the structure stageFor the whole build
HandoverStructure completeFinished house, ready to move into
PaymentBy milestoneBy milestone
Final figureWritten BOQ after a site visit and approved drawingsWritten BOQ after a site visit and approved drawings

How a project runs

  1. You call or visit the office. Bring your plot documents and your drawings, if you have them. If you have no drawings yet, we prepare them.
  2. We visit the site. We check the plot, the access, the levels and the services that are there.
  3. We prepare the written BOQ. It lists what is in and what is out, item by item, so you can see the scope before you commit.
  4. We agree the scope and the milestones. You know what is built at each stage and what is paid at each stage.
  5. We build. One team runs the material procurement, the site labour and the site management. You get progress reports as the work moves.
  6. We hand over. For grey structure, the structure is complete. For turnkey, the house is finished and ready to move into.

Residential

Approved drawings and submission

A build starts with approved drawings. We prepare the submission drawings for your plot. We submit them to the authority that covers your sector or society. The legal time for CDA approval is 22 days. That is the legal time, not a guarantee. The actual time depends on the authority, the plot documents and the drawings. We do not promise a date for approval.

Authority, and the approval work it covers

CDA submission

We prepare the submission drawings and submit them to the Capital Development Authority for sectors that fall under CDA. We follow the authority checklist and respond to its queries. You provide the complete plot documents. We tell you what is needed before we submit, so the file is complete.

CDA approval

RDA, DHA and Bahria Town submission

We prepare the submission drawings and submit them to the Rawalpindi Development Authority, to DHA, or to Bahria Town, as your sector or society requires. Each authority has its own checklist and its own process. We follow the one that applies to your plot, and we respond to its queries. The fee for our work is a lump sum. No figure is published.

Written BOQ and milestone payments

The final figure comes in a written BOQ after a site visit and approved drawings. That is the rule for every project. A rate means little until the scope is known, so we do not quote a per square foot figure before we have seen the plot and the drawings.

The BOQ lists the items, the quantities and the prices, so you can see what you are paying for. It states what is in and what is out. It is the basis for the milestone payments. For turnkey, the payments are tied to the milestones in the BOQ, so you pay as the work is done. For grey structure, the payments are tied to the structure milestones in the same way. The BOQ is the document that holds the scope and the payments together.

Overseas owners

You can build a house in Islamabad from abroad. In most cases, yes, you can build without being physically present throughout construction. We work with owners who live overseas, and we keep them informed as the build moves.

You will need to provide the complete plot documents, and some steps may need your documents or signature. We will tell you which steps those are, and when they are needed. You can visit the office when you are in Islamabad, or you can call us on +92 336 8000925. We will agree with you how progress is reported before the build starts.

Areas served

We build in Islamabad, from our office in B-17. We work in these sectors and societies: B-17, D-12, E-11, F-7, F-8, F-10, F-11, G-8, G-9, G-10, G-11, G-13, G-14, H-11, Faisal Margalla City and Faisal Hills. If your sector is not listed, call us and ask. We will tell you if we can build there.

FAQ

Frequently asked questions

Grey structure is the shell of the house. It is the structure, the walls, the roof and the basic plaster. Turnkey is the finished house. It is grey structure plus the flooring, the kitchen and bathrooms, the doors and windows, the paint and the fixed fittings. Grey structure suits an owner who wants to control the finishing. Turnkey suits an owner who wants one team to finish the house.

Grey structure includes the excavation and foundations, the structure and frame, the brickwork and blockwork, the roof and the basic plaster. It includes the material procurement and the site labour for those items, and the site management for the structure stage. It does not include the finishing, the fixtures, the fittings or the final services.

Turnkey includes everything in grey structure, plus the flooring and tiling, the kitchen and bathrooms, the doors and windows, the paint and the fixed fittings. It includes the electrical and plumbing work, the sanitary work and the final finishes. It includes the material procurement, the site labour and the site management for the whole build, and the handover at the end.

Utility meters (WAPDA, SNGPL), security deposits and post handover maintenance are not included in grey structure or turnkey. These are not in the build cost, so you should budget for them apart from the BOQ.

We build in Islamabad, from our office in B-17. We work in B-17, D-12, E-11, F-7, F-8, F-10, F-11, G-8, G-9, G-10, G-11, G-13, G-14, H-11, Faisal Margalla City and Faisal Hills. If your sector is not listed, call us on +92 336 8000925 and ask. We will tell you if we can build there.

In most cases, yes. You can build from abroad if you provide the complete plot documents and sign the papers that need your signature. We will tell you which steps need your documents or signature, and when. We will agree with you how progress is reported before the build starts, so you know what is happening on site.

Turnkey payments are by milestone, tied to the written BOQ. The BOQ lists the items, the quantities and the prices, and it states what is in and what is out. You pay as the work is done, at the milestones agreed before the build starts. The final figure comes in the written BOQ after a site visit and approved drawings.

There is no single figure, because the cost depends on the plot size, the drawings, the structure and the finishing you choose. The final figure comes in a written BOQ after a site visit and approved drawings. The BOQ lists what is in and what is out, item by item, so you can see the scope before you commit.

There is no fixed time, because the build time depends on the plot, the drawings, the approvals and the finishing. We agree the build sequence with you before the work starts, and we report progress as the work moves. We do not promise a build time before we have seen the plot and the drawings.